See It
Happen!
The nearly 1/2 acre
greenhouse structure is being built now!
Come back often and watch the progress!
|
The under-floor sandwich
- 3/4" rigid insulation, rebar, wire mesh, in-floor radiant
heat tubing and a top layer of wire mesh
|
|
|
Pouring the floor
|
|
|
The first 9' x 156'
slab complete
|
|
|
The heat tubes
penetrating through the first slab. They will continue into
the next slab.
|
|
|
The second slab framed
and ready for concrete
|
|
|
Pouring the second
slab.
|
|
|
Pouring the second
slab.
|
|
|
The first bay, 36' x
156' floor complete except for the north end where the heat tubes go
into the manifold.
|
|
|