See It
Happen!
The nearly 1/2 acre
greenhouse structure is being built now!
Come back often and watch the progress!
|
April 3, 2002: Shaun
Strickland, Kirby Peak Ranch Operation Manager, arrives on
site!
John Pade (left),
Shaun Strickland (middle) and Richard Radanovich (right).
|

|
|
Dennis Mangan (top),
with Jim Dunlap (left) and John Vittands (right), installing the
south facing end wall .
|

|
|
Finishing the south
wall.
|
|
|
The tomato bay with the retractable
roof and side-wall complete.
|
|
|
Jim Dunlap and John
Vittands tightening the roof cables.
|
|
|
John Pade and John
Vittands tightening cables
|
|
|